Nuclear Power

  • Qinshan Nuclear Power Plant--Zhejiang
Qinshan Nuclear Power Plant--Zhejiang

Qinshan Nuclear Power Plant--Zhejiang

  • Description: Qinshan 1 in Zhejiang province 100 km southwest of Shanghai, is China's first indigenously-designed and constructed nuclear power plant (though with the pressure vessel supplied by Mitsubishi, Japan).
  • Book The Business Trip
Qinshan 1 in Zhejiang province 100 km southwest of Shanghai, is China's first indigenously-designed and constructed nuclear power plant (though with the pressure vessel supplied by Mitsubishi, Japan). Design of the 300 MWe PWR was by the Shanghai Nuclear Engineering Research & Design Institute (SNERDI). Construction work spanned 6.5 years from March 1985, with criticality in December 1991. It was shut down for 14 months for major repairs from mid-1998.

In October 2007, Qinshan 1 was shut down for a major upgrade. The entire instrument and control system was replaced, along with the reactor pressure vessel head and control rod drives. Areva NP supervised the work, which is likely to lead to life extension beyond the original 30 years.

Qinshan Phase II units 1&2 are locally-designed and constructed 2-loop PWR reactors, scaled up from Qinshan 1, and designated CNP-600. Unit 1 started up at the end of 2001 and entered commercial operation in April 2002. Unit 2 started up in March 2004, with commercial operation in May 2004.

Qinshan Phase III units 1&2 use the Candu 6 pressurised heavy water reactor (PHWR) technology, with Atomic Energy of Canada (AECL) being the main contractor of the project on a turnkey basis. Construction began in 1997 and unit 1 started up in September 2002 and unit 2 in April 2003. They are each about 665 MWe net.

Qinshan Phase II-3&4:Construction of the second stage of Qinshan Phase II was formally inaugurated at the end of April 2006, though first concrete had been poured for unit 3 in March. That for unit 4 was poured in January 2007. Local content of the two 650 MWe CNP-600 reactors will be more than 70% and scheduled construction time is 60 months.